Commercial Air Conditioning – Melody Lane, Highbury

Share this:
Location

Melody Lane, Highbury

Main Contractor

Mode Construction

Project details:

We were brought to this project by Mode Construction. We have designed and are installing a centralised heat recovery ventilation system to this new build 7,000 square foot three storey office block along with all local WC and kitchen extraction. To provide the heating and cooling we have specified a Daikin Air Conditioning system across the 6 wings spread over the 3 floors. We are installing a total of 21 indoor units split over 3 VRV systems plus some smaller split/twin split systems. All ducted indoor units and containment are to be left exposed with flat oval ductwork to supply grilles all giving a very industrial feel to the overall environment. All external plant will be positioned in a central roof plant room area. This project is due to complete mid-March 2017.

Looking for something similar?

If you require help designing and installing commercial air conditioning then get in touch with AAC today to arrange a free survey and quote at a time that suits you. Email info@aac.uk.net or call 01707 32 55 66 or fill in the form below.

Find out more about:

Get in touch
Arrange your

FREE SURVEY
& QUOTE

Contact us using the details below or fill out the form and we'll be straight in touch.

    Please see our Privacy Policy for details on how we look after your information.

    Thank you! Your submission has been received!
    Oops! Something went wrong while submitting the form.

    Our Services

    Our Services